A new plan is needed

Following the release of the newest video designed to help save the lower Main from destruction at the hands of a developer, the developer in question, Angus, has said it needs more time to complete its project.

They are also now talking about a smaller building, closer to the Monument Nationale in size, instead of the 12-storey behemoth Quadrilaterre they had planned. This is largely due to the efforts of the Save the Main Coalition and the court case brought on by Cafe Cleopatre owner John Zoumboulakis.

While this buys the artists trying to save the Cleo and other historic building some time (the wrecking ball was supposed to fall in March), the fight isn’t over yet. Some have suggested that a new, alternate plan is needed.

Donovan King of OTL explained this on CKUT radio before the latest announcement from Angus:

[mp3player width=350 height=20 config=fmp_jw_widget_config.xml file=https://optative.net/ckutkingmain.mp3]

One Response to “A new plan is needed”

  1. OTL Blog » Blog Archive » Montreal Artists present new Urban Plan for Lower Main Says:

    […] problem was recently identified during a CKUT radio interview with Craig […]

Leave a Reply